Morvarid Petrochemical Distillation Tower

Weighing approximately 195 tons with a diameter of 3 meters and a height of 70 meters, which has been delivered to the employer in less than 3 months and shorter than the contract time.

Design, supply of materials, construction and delivery of Gachsaran Petrochemical Tower

Weight 160 tons, diameter 7 meters and length 35 meters

De-Ethanizer Tower of Kangan Petroleum Refinery Project

Internal diameter 5800mm and length 39000 mm and thickness 54mm and weight 320 tons

Distillation towers of Arian D-Polymer Petrochemical (Assaluyeh)  methanol design

Weight 233 tons, length 24 meters, diameter 4 meters Weight 136 tons, length 40 meters, diameter  4.5 meters

Mahshahr Oil Product Terminal Revamp - On Shore:

This project is considered to increase storage capacity, import and export of petroleum products of Abadan refinery. The scope of the project engineering, procurement, construction, erection and commissioning :

•8 fuel oil storage tanks 250,000 bbl.

•4 gasoil storage tanks 250,000 bbl.

•2 fuel oil heaters

•5 gasoline storage tanks 100,000 bbl.

•Firefighting storage tank 120,000 bbl.

•80 km piping

South Pars gas field development phase 14 (SPGFD Phase 14)

Machine Sazi Arak Co. as one of the members of the Consortium Phase 14 of the South Pars gas field development project, with a contract with a value of US$ 240,000,000 with a share of 4.57 % of the total plan, was responsible for providing the fixed equipment of the refinery.

Shazand ( Arak) Refinery Towers  Development Plan:

engineering, procurement and construction of 4 towers with following specifications(Licensor, Axens):

Splitter ( V- 3403): The tallest tower ever fabricated in the country, having a height of 101.5 m, a Dia. Of 6.1 m, weighing 785 tons made of SA- 516-GR70 fabricated in 15 months


EPC Projects Catalogue